2019 has turned to 2020 and the construction of Saintpid’s new studio slowly progresses. The picture is from when we got rid of the last rock, since then we’ve moved the pile of 55 cubic meters rocks from the site and added drainage and shingle to begin casting the plate. We’ll add photos as the build progresses, either here or Instagram. (https://www.instagram.com/saintpid_mastering). If everything goes as planned, the studio should be ready sometime in June, then there will be a few weeks of test mastering and calibration to start full-time this fall in Saintpids fourth and hopefully the best studio so far!

Welcome to a great sounding 2020!